Since entering the replica watches ring, with the watch more and replica watches online more knowledge, more and swiss replica watches more deep understanding of the rolex replica is also more and more favorite.

EVALUATION OF ASSESSMENT
if repairer will produced the duly filled above narrated damage certificate form undersigned evaluate the assessment on the basis of calculated man hour with incremented percentages ( relevant to the nature/extent of damages) of the recommended timing schedule of the claimed item manufacturer plus cost of spare parts and in considering the other factor/parameter/endorse of the purview of the insurance policy and submit the report very next day accordingly.
If repairer will not produced the above narrated duly filled damage certificate form, we have no alternative to bring an speculation and calculated the man hour on the basis and physical observation of the claimant repairer workshop goings during the period of inspection or past records of the mode of the settlement and issued a registered letter to the claimant repairer with copy forwarded to all relevant concern for information with highlighting the speculated man hour calculation and assessment data sheet, whose non reciprocation after seven days deemed as the repairer's acceptance of the produced assessment data sheet of the claim. and submit report accordingly after discussion with the policy issuing insurance company
.

WHY AN INDEPENDENT SURVEYOR SHOULD NOT MAKE FREQUENT INSURANCE COMPANY VISIT
Manning of SURVEYOR's working time.(Daily)

TOTAL HOURS IN A DAY 24.00

WORKINH HOURS 12.00

CONVEYANCE TIME FOR INSPECTION/OFFICE 3.00

INSPECTION TIME ONE VISIT DAILY 3.00

ARBITRATION & NEGOTIATION TIME 2.00

BACK UP OFFICE JOB TIME 2.00
LEASURE TIME 1.00

INSURER'S OFFICE VISITING TIME 1.00


OVER HEAD Monthly(Projected)

A full time staff with conveyances Rs2,500/-
Office Rent Rs 225/-
Office Electricity Rs 250/-
Office cleaner & Water man charges Rs 350/-
Office computer maintaince chargesupgradation) Rs 860/-
Residance Computer Maintaince charges (upgradation) Rs 850/-
Lap top Computer maintaince Charges Rs 450/-
Office Telephone with internate/fax Rs 980/-
Residance Telephone with internate/fax Rs1,450/-
Staff pager charges Rs 175/-
Mobile phone charges Rs1,000/-
Conveyance ( one motor cycle & one old car ) Rs4,500/-
Postage and stationary Rs 925/-
Photography charges Rs3,320/- 17835.00

Add: Profit & Home Expenses 7,500.00
25,335.00

Working day in a monrh 26 days
Per hour charges required with (8 Hr) two man head 60.90 & per day 730.82 (12 Hrs)

Which only concludes that undersigned have to do twenty six survey assignment in a month and one inspection visit in a day. Unable to get time to visit insurer's office more than one hour daily.

Lacinia dictum, dictum a lacus

Proin congue odio sit amet ante facilisis eleifend. Morbi dolor. Vivamus vulputate purus vitae leo. Ut congue commodo leo. Phasellus eget libero.

carPellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Donec fermentum elit sed nunc. Fusce mollis. Curabitur ultrices augue eu lectus. Suspendisse potenti. Fusce enim. Nunc at libero. Proin porttitor, erat porta suscipit tristique, eros sem rhoncus dolor, sit amet pellentesque tellus lorem eget nisi.